THERMOFLOW MECHANICAL INSTALLATION

Plumbing & Mechanical
Installation

Plumbing & mechanical installation.
Domestic, commercial & industrial enquiries welcome.

BASED IN DUBLIN · DOMESTIC · COMMERCIAL · INDUSTRIAL

ABOUT THERMOFLOW

Plumbing & Mechanical
Installation

Thermoflow Mechanical Installation Limited is a Dublin-based company providing mechanical installation services for commercial and industrial projects. We work with main contractors, mechanical contractors and commercial clients on pipework installations, plantroom upgrades and the replacement of existing mechanical systems.

Our work includes heating and chilled services, pipefitting, welding and associated mechanical plant. We undertake defined subcontract packages and planned replacement works within existing buildings. We also welcome enquiries for domestic plumbing projects and are happy to discuss your requirements, whatever the setting.

More about Thermoflow

Established in 2025, the company brings together trade experience across commercial, hospitality and industrial environments.

Health and safety is central to how we plan and carry out our work. Site requirements, access, isolations and shutdowns are agreed with the project team before work begins, with attention to safe working practices and coordination with other trades.

WHAT WE DO

Mechanical Installation Services

01

Heating & Chilled Services

Installation and modification of LPHW and CHW services, including distribution pipework, pumps, valves, supports and connections to boilers and chillers.

02

Plantroom Installation & Upgrades

Installation and replacement of boilers, chillers, pumps and calorifiers, including strip-out of existing plant and tie-ins to existing services.

03

Pipefitting & Welding

Fabrication and installation of carbon steel, copper and stainless steel pipework, including welding, supports and connections to mechanical plant.

04

Plant Replacement & System Alterations

Replacement of mechanical plant, pumps and valves, with alterations to existing pipework. Shutdowns and tie-ins are coordinated around the building’s heating, cooling and hot water requirements.

Health & Safety

We take health and safety seriously on every project. We plan access, isolations and shutdowns with the site team, follow site procedures and coordinate our work with other trades.

PROJECT EXPERIENCE

On site.
In the detail.

A selection of mechanical installations and upgrades, showcasing hands-on experience in heating, hot water and chilled water systems.

NESTA boilers and associated plant-room pipework.

PHASED BOILER REPLACEMENT

Three Head Office

Sir John Rogerson’s Quay, Dublin

Replacement of two existing boilers with two NESTA boilers in stages. One boiler remained available to support heating and hot-water demand between planned shutdowns and connections to the existing headers.

View scope & photographs

Scope of works

  • Removal of the first existing boiler and installation of its NESTA replacement.
  • Coordinated shutdown and tie-in to the existing system headers.
  • Replacement of the second boiler once the first NESTA was operational.
  • A further planned shutdown for the remaining header connections.
Three HeatMaster boilers installed within the existing plant room.

HOT-WATER CAPACITY UPGRADE

Portmarnock Sports & Leisure Club

Portmarnock, Dublin

Installation of three HeatMaster boilers to support increased domestic hot-water demand at the leisure centre. Tie-ins to existing services were coordinated through planned, after-hours shutdowns to minimise disruption to club operations.

View scope & photographs

Scope of works

  • Installation of three HeatMaster boilers.
  • Associated pipework and connections to existing domestic hot-water services.
  • Organised after-hours shutdowns for system tie-ins.
New boiler and pump installation with pipework insulated.

BOILER, PUMP & AHU UPGRADE

Trinity College Dublin

Geology facility, near Macken Street

Replacement of three boilers in separate service cupboards, with upgraded Grundfos circulation pumps and associated pipework. The wider project also included installation of a rooftop air-handling unit.

View scope & photographs

Scope of works

  • Removal of existing boiler and pump equipment.
  • Replacement of three boilers in separate service cupboards.
  • Upgraded Grundfos circulation pumps, associated pipework and insulation.
  • Installation of a rooftop air-handling unit.
Completed chilled-water pump installation.

CHILLED-WATER & HEATING UPGRADE

PTSB Head Office

St Stephen’s Green, Dublin

Mechanical upgrade involving replacement chillers, chilled-water pumps and boilers. Boiler replacement was phased, retaining an existing boiler to support heating and hot-water demand during the works.

View scope & photographs

Scope of works

  • Replacement chillers and chilled-water plant, including pumps.
  • Replacement boilers installed through a phased programme.
  • An existing boiler retained to support heating and hot-water demand.

LET’S TALK

Have a project in mind?

Domestic, commercial or industrial — we welcome all plumbing and mechanical project enquiries.

Discuss your project